SIIG USB Over IP Guía de instalación Pagina 2

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 1
2
Package Contents
USB over IP
Power adapter
Software CD
Quick installation guide
Layout
Figure 1: Front Layout
Power LED: USB over IP is powered on
Ready LED: When the box is powered on, the USB
over IP goes through it's initialization/bootup
sequence. The Ready LED will blink for 10 seconds,
then go off for 10-15 seconds, when it comes back on
the USB over IP is ready for use. If the Ready LED
ever goes off, power-off then power-on the USB over
IP. It is recommended to unplug all devices from
the USB over IP during it's initialization/bootup
sequence.
Ready LED
Power LED
Vista de pagina 1
1 2 3 4 5 6 7 ... 15 16

Comentarios a estos manuales

Sin comentarios